3921 Holland Blvd.
Chesapeake, VA 23323
Phone
(757) 485-4690
Fax
(757) 485-4779
Office Hours
7:30am-4:30pm ET
Available for service 24 hours a day.
Sales
Steve Lyon
Cell Phone: (757) 298-0663
Email: slyon@thompsonpump.com
Products and Services
In addition to the full Thompson Pump product line, the Chesapeake Branch carries the following products and offers the following services:
Pumps and Equipment | Pump Accessories | Services |
Air stripper systems* | Water towers* | 24 hour availability |
Diesel pumps | Auxiliary fuel tanks | Bypass installation |
Electric submersible pumps | Containment berms | Bypass decontamination |
Filtration* | Driveway crossings | Deep well installation |
Frac tanks* | Flotation devices | Emergency response |
Generators* | HDPE pipe | Field service |
Hydraulic pumps | Hose and pipe fittings | Fuel services* |
Pump rental | Pipe plugs | HDPE pipe fusion |
Pump sales | Piping accessories | Installation and tear down |
Sediment tanks* | PVC pipe | Pump maintenance and repair |
Weir tanks* | Sediment bags | Pump refurbishment |
Suction and discharge hoses | 24/7 Pump watch | |
Water trailers* | Service contracts | |
Wellpoint accessories | Sewer bypass | |
Slurry wall installation* | ||
Sock trenching | ||
Spare part sales | ||
System design | ||
Training | ||
Wellpoint dewatering | ||
Wellpoint installation |
*Available by special request.
Rentals and Support
When you rent from the Chesapeake Branch, you not only have the support of the branch, but the entire Thompson Pump Network. Our branch provides a variety of turn-key services and accessories in addition to the #1 Rental Fleet in Coastal Virginia. All backed by the experience and expertise of our knowledgeable branch staff who are on-call 24/7 to assist with your pumping needs.
Local Jobs


Thompson Pump is handling a 14.2MGD bypass for a municipality while a major sewer line is being protected during a bridge replacement. At times with heavy rains, the bypass is exceeding required flows to keep these extreme events under control. The bypass is continuing and has been handling required flows since February of 2017.
Contact This Location
* Denotes required field.