Mission Main Bypass, Kansas City, MO
Mission Main is the major sewer treatment plant in Johnson City, KS. Sections of 24” and 30” sewer lines that ran parallel to each other and shared a common manhole were in need of repair. New sewer pipe had been purchased for replacement... Read More
Sewer Bypass and Replacement in Atlanta, GA
W.L. Hailey Construction contacted Thompson Pump’s Atlanta, GA representative for assistance in a sewer bypass and replacement in a residential area outside the Buckhead business section in Atlanta. Phase I & II of this project started mid... Read More
2MGD Sewer Bypass and Lift Station Rehabilitation in Orlando, FL
A local Central Florida contractor was called upon to rehabilitate a lift station in Orlando, FL. The work included replacing approximately 1,500-feet of 30-inch sewer line and the installation of new manholes along the system. Thompson Pump’s ... Read More
Thompson Pump Successfully Performs 35MGD Bypass in Memphis, TN
In Memphis, TN, White Contracting of Cordova, TN, was working on one of the largest construction projects they have ever worked on. White Contracting was installing several thousand feet of new 72” diameter gravity flow sewer pipe. The final st... Read More
Thompson Pump Promotes TSC Pumps for APWA-FL Tradeshow
Thompson Pump’s TSC series of compressor-assisted dry prime trash pumps range in size from 4”-8” and handle the toughest sewer bypass situations using the revolutionary environmentally safe Enviroprime System®. Engineered to han... Read More
Thompson Pump Dewaters a Part of the Kansas River
Thompson Pump’s Kansas City Branch representative was called to provide assistance on a pump upgrade on an existing raw water intake structure project on the Kansas River, in Johnson County, Kansas. The contractor had trouble dewatering a coffe... Read More